Request a demo
Products:
Commissioning software (Cx) Completion management software (CCMS) Operational Readiness
CxAI:
CxAI: Less Admin. More Commissioning. CxAI Feature Library
Pricing:
Commissioning software Completion management software Operational Readiness Request a demo
Core features:
Track Checklist Effort in Real Time Operational Readiness Orchestration Operational Readiness Planning Pre-Startup Safety Review & Readiness Gates Commissioning & Startup for Systems Readiness People Readiness & Operator Training Digital Handover & Information Readiness Enterprise Security for Operational Readiness Day 1 Assurance - Prove Readiness Operational Readiness Platform Procore API Integration
Industries:
Data Centers Oil & Gas Energy & Renewables Pharma & Life Sciences
Teams:
Owners & Developers Program Directors Asset Managers & Operators
Learn:
Blog Cx newsletter Commissioning 101 The book about commissioning
Support:
Help articles and information Live chat-support Contact-us Talent

Energy commissioning software for wind, solar, and BESS

Wind farms, solar parks, and BESS facilities hand over to long-term O&M operators. The O&M contract starts on Day 1. The documentation - maintenance procedures, grid connection records, OEM sign-offs, spare parts strategy - is typically still being assembled when the operator arrives.

CxPlanner connects commissioning records from every OEM and subcontractor to the O&M handover package throughout the project, so the documentation is complete before the operator shows up.

CxPlanner multi-OEM commissioning and O&M handover dashboard for energy and renewables

Used by owners and O&M operators to track multi-OEM commissioning and handover readiness across wind, solar, and BESS projects.

Their world

The O&M operator inherits a commissioned asset and a documentation problem.

Commissioning records from four parties arrive in four formats with no asset structure.

Turbine OEM sign-offs. Electrical subcontractor test results. Grid connection records. Civil certificates. Each arrives separately, in the format that party uses, filed by contractor. The O&M operator receives a shared drive and spends the first months building the documentation structure the project should have built.

Grid connection sign-offs are tracked in email - outside the commissioning record.

Protection relay test results and energisation records are managed across email threads with no connection to any commissioning platform. When the O&M operator asks for the complete grid connection history, someone has to locate the emails, find the attachments, and assemble a record.

O&M procedures are written after the operator arrives, not before.

Maintenance routines and emergency procedures for turbines, inverters, and BESS systems are consistently left until the O&M period. Not reviewed against actual system behaviour. Delivered to operators who are already expected to be running a live facility.

How CxPlanner fits

Multi-OEM commissioning records and O&M documentation built in one place.

Energy commissioning software for wind, solar, and BESS projects runs in CxPlanner alongside the operational readiness programme.

Turbine OEM commissioning, electrical subcontractor check-sheets, and grid connection sign-offs all run in one platform. Grid connection milestones are tracked as commissioning gates - protection relay test results and DNO approvals attached to the assets they cover, part of the commissioning history the O&M operator navigates post-handover.

O&M procedures and maintenance routines are written and reviewed inside CxPlanner as a parallel workstream alongside renewable energy commissioning - tracked against schedule milestones, linked to the assets they cover, complete before the O&M contract begins.

Multi-OEM commissioning records connected to O&M documentation in CxPlanner

What CxPlanner covers in energy and renewables operational readiness

Multi-OEM and multi-subcontractor records unified in CxPlanner
Multi-OEM and multi-subcontractor records in one platform

A unified record, not four parties' paperwork

Turbine OEM, electrical, and civil scope managed in CxPlanner. Each party contributes directly - no separate submissions to reconcile. The O&M operator navigates a unified record, not four parties' separate documentation.

Asset-linked documentation navigable by turbine, inverter, or cable circuit

Navigate to the turbine, inverter, or cable circuit

Every test result, O&M manual, and sign-off linked to the specific asset it covers. The O&M engineer navigates to the asset - not to a shared drive folder.

Asset-linked documentation navigable by turbine or inverter in CxPlanner
Grid connection milestones tracked as commissioning gates in CxPlanner
Grid connection milestones inside the commissioning record

Part of the record from the day of sign-off

Protection relay results, DNO sign-offs, and energisation approvals tracked as commissioning gates. The complete grid connection record is part of the energy commissioning software history from the day each sign-off is completed.

O&M procedure development alongside commissioning

Complete before the O&M contract begins

Maintenance routines and emergency procedures written, reviewed, and approved inside CxPlanner as a parallel workstream. Complete before the O&M contract begins - not started after the operator arrives.

O&M procedures developed alongside commissioning in CxPlanner
BESS-specific commissioning documentation in CxPlanner
BESS-specific commissioning documentation

Battery storage requirements in the same record

Energisation milestones, protection relay testing, and grid integration sign-offs for battery storage within the same commissioning record. The specific requirements for BESS commissioning are part of the asset history the O&M team inherits.

Key outcomes

What the O&M handover looks like when it is built throughout the project

The O&M operator receives a package they can use on the first day of the contract.

Asset-linked, searchable documentation navigable by component. The O&M engineer finds the maintenance procedure for a specific turbine gearbox in seconds - not after working through 200 unstructured PDFs. The package is complete because it was built as the project progressed.

Grid connection history is in the commissioning record - not in a former team member's inbox.

When the O&M operator needs to confirm protection relay settings six months into the contract, the answer is in CxPlanner - linked to the specific asset, timestamped, attached to the original test record.

Day 1 generation performance is a target the project tracks.

O&M procedures, spare parts strategy, and operator readiness run alongside commissioning. When the programme closes and the O&M contract begins, readiness is complete.

Related solutions

Information readiness

Asset-linked documentation, O&M procedures, and digital handover packages for Day 1 operator use.

Explore information readiness

Handover management

Sign-off workflows and digital handover package compilation throughout the project.

Explore handover management

Multi-contractor coordination

Multi-OEM and multi-subcontractor commissioning in one platform with role-based access.

Explore orchestration

See how CxPlanner builds the O&M handover package throughout your energy project

The O&M documentation problem is a project problem - not an O&M problem. CxPlanner builds it throughout the project, from every party, into one asset-linked record. Book a walkthrough.

Book a demoRequest a walkthrough

Common questions about energy and renewables operational readiness

What makes operational readiness different for energy and renewables projects?

The O&M contract starts on Day 1 - documentation, maintenance baselines, and training need to be complete before handover, not developed during the early O&M period. The multi-OEM structure also creates a documentation challenge: turbine manufacturer, electrical subcontractor, civil contractor, and grid connection team each contribute records that need to form a coherent history.


How does CxPlanner handle turbine OEM commissioning requirements?

OEM commissioning checklists run inside CxPlanner alongside the project scope. OEM representatives complete sign-off records in the same platform the O&M operator will use post-handover - not in a separate document to integrate at project close.


How are grid connection milestones tracked in CxPlanner?

Protection relay results, DNO sign-offs, and energisation approvals are tracked as commissioning gates inside CxPlanner - linked to the assets they cover. The complete grid connection record is part of the commissioning history from the day each sign-off is completed.


Does CxPlanner support BESS commissioning and operational readiness?

Yes. Energisation milestones, protection relay testing, grid integration sign-offs, and documentation requirements for BESS commissioning are managed within CxPlanner. The OR programme for a BESS facility runs on the same platform as the commissioning work.